Downtown Development Plan EIR and Traffic Operations Analysis
  Hexagon prepared a traffic study report for the planned buildout of downtown San Jose. The study was undertaken to assess the transportation impacts of additional development downtown. The additional development consisted of approximately 4.0 million square feet of office, 350,000 square feet of retail, 2,400 hotel rooms, 3,500 residential units, a museum, and a theater. These developments are located on more than 20 separate parcels throughout the downtown area.